Scaffold returns TG20:13

Using a scaffold return as a return tie

Scaffolding erected around the ends of building facades to follow the line of the buildings are what are termed as “scaffold returns” and when erected in the correct manner can be regarded as providing a sufficient attachment to the scaffold at each lift of a scaffold equivalent  to the standard tie positioned at the end of a building façade.

The following practice should be followed when using a scaffold return as a tying return:

  • Façade bracing should be installed to both return and façade elevations and the scaffold should be adequately tied (depending on number of bays and lifts)
  • Returns ledgers should extend to connect to both the inside and outside ledgers of the façade scaffold to where the return is been attached.
  • Where the corner guardrails from both return and façade elevations meet at the corner standard(upright) the connections to the standard should be fixed with load bearing right angle double couplers at every lift. (Inclusive of a scaffolder none working lift used during erection).

Any scaffolding elevations with a return at one end only must be tied with a standard tie arrangement.

scaffold returns
Enquire Now!

    I agree to your Privacy Policy
    Call our team! 0115 979 4523
    Privacy Overview

    This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

    Strictly Necessary Cookies

    Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

    3rd Party Cookies

    This website uses Google Analytics & Lead Forensics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

    Keeping this cookie enabled helps us to improve our website.